Past Projects
Caltrans Emergency Project
04-3Y9204
7/24-11/24
.png)
Caltrans Emergency Project
04-3Y9204
The Caltrans 04-3Y9204 Project consists of the installation of an anchored wired meshed system at an ongoing slide on Highway 26 above Calistoga.
Project Characteristics
Public Work
Final Contract Amount $800,000
Owner: Caltrans
General Contractor: Engelke Construction
Healdsburg Elementary School Playground Improvements
6/24-8/24
.png)
Healdsburg Elementary School Playground Improvements
The Healdsburg Elementary School project consists demolition, grading & paving for a new playground area.
Project Characteristics
Public Work
Final Contract Amount $146,000
Owner: Healdsburg Unified School District
General Contractor: GCCI, Inc.
Sonoma Valley High School Science Building
6/23-8/24
.png)
Sonoma Valley High School Science Building
The SVHS Valley High School Science Building project consists of clearing, demolition, grading, underground utility installation & paving for a new science building and new parking lot.
Project Characteristics
Public Work
Final Contract Amount $1,048,000
Owner: Sonoma Valley Unified School District
General Contractor: GCCI
Fitch Mountain Elementary School
Site Improvements
6/24-8/24

Fitch Mountain Elementary School Site Improvements
The Fitch Mountain Elementary project consists demolition, grading & paving for new ADA Improvments, Playground & New Landscaping.
Project Characteristics
Public Work
Final Contract Amount $259,700
Owner: Healdsburg Unified School District
General Contractor: FRC, Inc.
Healdsburg High School Frost Hall Improvements
6/24-8/24
.png)
Healdsburg High School Frost Hall Improvements
The Healdsburg High School Frost Hall project consists demolition, grading & storm drain work for ADA ramp improvements.
Project Characteristics
Public Work
Final Contract Amount $78,500
Owner: Healdsburg Unified School District
General Contractor: GCCI, Inc.
Cali Calmecac Academy
Increments 1-3
4/22-8/24
Cali Calmecac Academy
Increments 1-3
The Cali Calmecac project project consists of demolition, grading, underground utility installation & paving for temporary student facilities and installation of infrastructure for a new 2 story building and 4 transitional Kindergarten buildings.
Project Characteristics
Public Work
Final Contract Amount $2,170,000
Owner: Windsor Unified School District
General Contractor: Arntz Builders
Caltrans 04-3Y5304
11/23-4/24
Caltrans 04-3Y5304
The Caltrans Emergency Timber Cove project consists of the installation of a soldier pile wall and all associated work for it's installation. We are a subcontractor on the project working for Gordon N. Ball. Our portion of the work includes storm drain installation and earthwork.
Project Characteristics
Public Work
Final Contract Amount $456,400
Owner: Caltrans
General Contractor: Gordon N. Ball

Caltrans 01-0N4204
9/23-6/24
Caltrans 01-0N4204
The Caltrans Emergency Dos Rios project consists of the installation of a welded steel pipe culvert & associated road repairs. We are the General Contractor & performing most of the work.
Project Characteristics
Public Work
Final Contract Amount $1,200,000
Owner: Caltrans
General Contractor: Engelke Construction
Oak Manor Elementary School
6/23-4/24

Oak Manor Elementary
The Oak Manor Elementary project project consists of clearing, demolition, grading, underground utility installation & paving for 2 new school buildings and a playground..
Project Characteristics
Public Work
Final Contract Amount $794,500
Owner: Ukiah Unified School District
General Contractor: FRC, Inc.
Nokomis Elementary School
6/23-4/24

Nokomis Elementary
The Nakomis Elementary project project consists of demolition, grading, underground utility installation & paving for a new school building, ADA parking improvements and a playground.
Project Characteristics
Public Work
Final Contract Amount $510,400
Owner: Ukiah Unified School District
General Contractor: FRC, Inc.
Foothill Gathering Areas & Parking
Lot Improvements
10/2023-1/2024
Foothills Gathering Areas & Parking Improvements
The Foothills project consists demolition, grading, concrete installation, steel puncheon bridge installation, landscaping, fencing, striping & signage at Foothills Regional Park in Windsor. New pathways, sidewalks, gathering areas & ADA parking improvements are being constructed. We are the General contractor and performing all demolition and grading on the project.
Project Characteristics
Public Work
Final Contract Amount $522,540
Owner: County of Sonoma
General Contractor: Engelke Construction

Calistoga Jr/Sr High School
Interim Housing
12/2023-1/2024

Calistoga Jr/Sr High School Interim Housing
The Interim Housing project consists demolition, grading & storm drain work for the installation of temporary relocatable classrooms.
Project Characteristics
Public Work
Final Contract Amount $110,810
Owner: Calistoga Unified School District
General Contractor: Landmark Construction
Roseland Accelerated Middle School
Multi Purpose Addition
1/2023-8/2023
.png)
Roseland Accelerated Middle School
Multi Purpose Addition
The Rams project project consists of demolition, grading, Underground Utilities & ADA parking improvements for a multi purpose building addition.
Project Characteristics
Public Work
Final Contract Amount $132,975
Owner: Roseland Unified School District
General Contractor: GCCI
Ukiah Unified School District Fencing Projects
6/23-8/23


UUSD Fencing Projects
The UUSD fencing projects consists of demolition, grading & paving for ADA and fence improvements at the South Valley High School, Ukiah High School and Eagle Peak Middle School campuses.
Project Characteristics
Public Work
Final Contract Amount $217,892
Owner: Ukiah Unified School District
General Contractor: FRC, Inc.
Potter Valley Outdoor Learning Center
10/22-4/23
.png)
Potter Valley Outdoor Learning Center
The Potter Valley Outdoor Learning Center project project consists of demolition, grading & paving for a covered outdoor basketball court & ADA parking improvements.
Project Characteristics
Public Work
Final Contract Amount $122,827
Owner: Potter Valley Unified School District
General Contractor: GCCI
Prestwood Elementary
6/12-12/22
Prestwood Elementary
The Prestwood Elementary project project consists of demolition, grading, underground utility installation & paving for a new building addition.
Project Characteristics
Public Work
Final Contract Amount $365,900
Owner: Sonoma Valley Unified School District
General Contractor: Lathrop

Taylor/Healdsburg Sr Living Frontage
9/22-11/22
Taylor/Healdsburg Sr Living Frontage
The Taylor/Healdsburg Sr Living project project consists of demolition, grading, underground utility installation, Sidewalk, Curb Gutter & AC Paving for the frontages of the Taylor Residence & Healdsburg Sr Living.
Project Characteristics
Private Work
Final Contract Amount $163,200
Owner: Matt & Steven Taylor/Pacifica Properties
General Contractor: Engelke Construction
Healdsburg Lumber
7/21-12/22


Healdsburg Lumber
The Healdsburg Lumber project project consists of demolition, grading, underground utility installation & paving for their new facility on Healdsburg Ave/Old Redwood Hwy.
Project Characteristics
Private Work
Final Contract Amount $1,459,000
Owner: Eric Ziedrich
General Contractor: Eddinger Enterprises
Honor Mansion
11/21-8-22
Healdsburg Jr High Field Modernization
10/21-8-22
.png)
Healdsburg Jr High
Field Modernization
The Healdsburg Jr High School project project consists of demolition, grading, Storm Drain & Extensive Subdrainage System for the New Artificial Turf Field and Surrounding Improvements.
Project Characteristics
Public Work
Final Contract Amount $1,689,000
Owner: Healdsburg Unified School District
General Contractor: GCCI Inc. General Contractors
Upper Lake High School
1/22-8/22

Upper Lake
High School
The Upper Lake High School project project consists of demolition, grading, underground utility installation & paving for 2 New buildings. The project also includes a new bus dropoff for the students.
Project Characteristics
Public Work
Final Contract Amount $1,241,000
Owner: Upper Lake Unified School District
General Contractor: JL Modular
Napa Valley Language Academy
6/22-8/22

Napa Valley Language Academy
The NVLA project project consists of demolition, grading & paving for a for ADA improvements throughout the campus.
Project Characteristics
Public Work
Final Contract Amount $523,500
Owner: Napa Valley Unified School District
General Contractor: Wright Contracting
Evergreen Elementary School
Modernization & New Multi Purpose Building
6/2020-4/2022

Evergreen Elementary School
Modernization & New Multi Purpose Building
The Evergreen Elementary School project consists of demolition, grading, paving, storm drain, water main & sewer work on the Evergreen Elementary campus for new multi purpose building, 2 new parking lots and new playground.
Project Characteristics
Public Work
Final Contract Amount $1,771,900
Owner: Cotati-Rohnert Park Unified School District
General Contractor: Wright Contracting
Upper Lake Elementary School
6/2021-3/2022


Upper Lake
Elementary School
The Upper Lake Elementary School project project consists of demolition, grading, underground utility installation & paving for 3 new buildings kindergarten, student services & new student center. Improvements include a brand new parking lot to serve the new buildings.
Project Characteristics
Public Work
Final Contract Amount $1,026,600
Owner: Upper Lake Unified School District
General Contractor: JL Modular
Caltrans 04-2W5004
Emergency Culvert Replacement
1/2022-2/2022
Caltrans 04-2W5004
The Caltrans 04-2W5004 is an emergency project consisting of replacing a failed culvert on Highway 101 in Sausalito
Project Characteristics
Public Work
Final Contract Amount: $333,000
Owner: Caltrans
Napa Valley Unified School District
5 Modernizations
6/21-9/21


NVUSD
5 Modernizations
The NVUSD 5 Modernization project project consists of demolition, grading & storm drain for a new ADA Improvements on the Donaldson Way Elementary, Alta Heights Elementary & Silverado Middle School Campuses in Napa and American Canyon
Project Characteristics
Public Work
Final Contract Amount $575,000
Owner: Napa Valley Unified School District
General Contractor: Wright Contracting
Bricoleur Vineyards
9/16-20/20
Bricoleur Vineyards
The Hanson Ranch project consists of building a new winery facility in Windsor. Our portion of the project is grading, paving, lime treating, erosion control & storm drain installation.
Project Characteristics
Private Work
Final Contract Amount: $1,868,000
Owner: Mark Hanson
Novato High School
7/19-5/21

Novato High School
The Novato High School project consists of demolition, grading, paving, storm drain, water main & sewer work on the Novato High School campus for new science & arts buildings.
Project Characteristics
Public Work
Final Contract Amount $2,496,000
Owner: Novato Unified School District
General Contractor: Wright Contracting
The Matheson
9/19-4/21

The Matheson
The Matheson project consists of demolition, grading, paving and underground utilities for the new Matheson Restaurant.
Project Characteristics
Private Work
Final Contract Amount $779,000
Owner: Craig Ramsey
General Contractors: Eddinger Enterprises
Healdsburg Jr High
Gym Modernization
5/20-10/20


.png)
Healdsburg Jr High
Gym Modernization
The Healdsburg Jr High School project consists of demolition, grading & storm drain for a new ADA entrance to the Gymnasium.
Project Characteristics
Public Work
Final Contract Amount: $56,665
Owner: Healdsburg Unified School District
General Contractor: GCCI
Santa Rosa Memorial Hospital Medical Building
12/19-5/20


SRMH Medical Building
The SRMH Medical Building project consists of trenching & backfill for plumbing, electrical & gas.
Project Characteristics
Private Work
Final Contract $165,000
Owner: Santa Rosa Memorial Hospital
General Contractors: Indoor Environmental Services & Rex Moore
SRJC Petaluma Campus Building
6/19-10-20

SRJC Petaluma Campus Science Building
The SRJC Petaluma Campus project consists of demolition, grading, paving, storm drain, water main & sewer work on the SRJC Petaluma campus for infrastructure to a science building and parking area.
Project Characteristics
Public Work
Final Contract Amount $717,000
Owner: Santa Rosa Jr. College
General Contractor: JL Modular/Construction
Healdsburg High School Gymnasium & Locker Room
6/19-9/20


HHS Gymnasium
& Locker Room
The Healdsburg High School project consists of demolition, grading, paving, storm drain, water main & sewer work on the Healdsburg High School campus in Healdsburg for their new gymnasium.
Project Characteristics
Public Work
Final Contract Amount $2,029,000
Owner: Cotati-Rohnert Park Unified School District
General Contractor: Lathrop Construction
Carole Sauers Building 2019
10/19-9/20
Carole Sauers Building 2019
The Carole Sauers project consists of demolition, grading, paving and underground utilities for a new building.
Project Characteristics
Private Work
Final Contract Amount $458,200
Owner: Carole Sauers
General Contractors: Eddinger Enterprises

SVHS Culinary Arts Modernization
6/20-11/20
SVHS Culinary Arts
Modernization
The Sonoma Valley High School project consists of demolition, grading & storm drain for a new ADA entrance to the Gymnasium.
Project Characteristics
Public Work
Final Contract Amount $417,000
Owner: Sonoma Valley Unified School District
General Contractor: GCCI


.png)
NVUSD Modernizations
6/20-9/20
NVUSD
Modernization
The NVUSD Modernization project consists of demolition, grading & paving for a new ADA improvements.
Project Characteristics
Public Work
Final Contract Amount $491,000
Owner: Napa Valley Unified School District
General Contractor: Wright Contracting




Caltrans OQ7004
Emergency Culvert Replacement
4/20-10/20
Caltrans OQ7004
The Caltrans 04-2Q9504 is an emergency project consisting of replacing a failed culvert on Highway 1 near Jenner.
Project Characteristics
Public Work
Final Contract Amount: $172,000
Owner: Caltrans
Finishing Kitchens
1/20-4/20


Finishing Kitchens
The Finishing Kitchens project consists of demolition, grading, paving, & sewer work on the Vichy Elementary & Browns Valley Elementary School Campuses for new school Kitchens & ADA improvements.
Project Characteristics
Public Work
Final Contract Amount: $256,000
Owner: Napa Valley Unified School District
General Contractor: Arntz Builders
Caltrans 04-4Q4104
Emergency Slide Repair
9/19-3/20
Caltrans 04-4Q4104
The Caltrans 04-4Q4104 is an emergency project consisting of the installation of a sheet pile wall, rock slope protection, storm drainage, paving & striping.
Project Characteristics
Public Work
Final Contract Amount: $428,000
Owner: Caltrans
.png)
Technology High School
1/19-12/19

Technology High School
The Technology High School project consists of demolition, grading, paving, storm drain, water main & sewer work on the Technology High School campus in Rohnert Park.
Project Characteristics
Public Work
Original Contract Amount $2,954,589
Owner: Cotati-Rohnert Park Unified School District
General Contractor: Wright Contracting
Burge Building
Burge Building
The Burge project consists of demolition, grading, paving, storm drain & water main work for a new distillery in Rohnert Park
Project Characteristics
Private Work
Original Contract Amount: $228,400
Owner: Rental Center Properties
General Contractor: 5280 CM
PSTC Multi Purpose Building SRJC Windsor Campus
9/18-6/19


PSTC Multi Purpose Building SRJC Windsor Campus
The PSTC Multi Purpose Building project consists of demolition, grading, paving, storm drain, water main & sewer work on the SRJC Windsor campus for infrastructure to a new multi purpose building. The work also includes ADA improvements throughout the existing campus.
Project Characteristics
Public Work
Final Contract Amount: $408,400
Owner: Santa Rosa Jr. College
General Contractor: JL Modular/Construction
1111 Main St Helena
5/19-6/19
1111 Main St Helena
The 1111 Main Project consists of grading, paving and sewer work.
Project Characteristics
PrivateWork
Final Contract Amount: $70,800
General Contractor: 5280 CM
Golden State Cider
2/19-5/19


Golden State Cider
The Golden State Cider project consists demolition, grading, paving & electrical conduit work for their new manufacturing facility in Healdsburg.
Project Characteristics
PrivateWork
Final Contract Amount $77,800
Owner: Golden State Cider
General Contractor: Eddinger Enterprises
Montage Healdsburg
11/18-5/19

Montage Healdsburg
The Montage Healdsburg project consists of grading & erosion control work for the new resort in Healdsburg.
Project Characteristics
Private Work
Final Contract Amount $800,000
Owner: Montage Hotels & Resorts
General Contractor: Wright Contracting
Terrace Middle School
2/2018-2/2019


Terrace Middle School
The Terrace Middle School project consists of demolition, grading, paving, sewer & storm drain work for a new 7 new buildings & expansive decorative courtyard.
Project Characteristics
Public Work
Final Contract Amount: $871,427
Owner: Lakeport School District
General Contractor: FRC, Inc.
Healdsburg High School Track & Field Modernization
5/2018-10/2018


Healdsburg High School Track & Field Modernization
The Healdsburg High School project consists of demolition, grading, paving, storm drain, water main & sewer work on the Healdsburg High School campus.
Project Characteristics
Public Work
Final Contract Amount 1,809,000
Owner: Healdsburg Unified School District
General Contractor: FRC, Inc.
Caltrans 04-2Q9504
Emergency Culvert Replacement
9/2018-10/2018

Caltrans 04-2Q9504
The Caltrans 04-2Q9504 is an emergency project consisting of replacing a failed culvert and installing a headwall on Highway 1 near Olema.
Project Characteristics
Public Work
Original Contract Amount: $250,00
Owner: Caltrans
Engelke Construction Yard & Office
5/2018-12/2018


Engelke Construction Yard & Office
The Engelke Construction Yard & Office project consists of building our 6,000 SF office & shop along with parking for our employees and parking for our equipment. Our portion of the project is grading, paving, water, sewer, Stormtech system & storm drain installation.
Project Characteristics
Private Work
Owner: Jerry & Joanna Engelke
General: Eddinger Enterprises
Vintner's Inn
8/2016-10/2018

Vintner's Inn
The Vintner's Inn consists of two new hotel buildings, a spa building, pool and parking lot. Our portion of the work includes the following:
-
Exterior site demolition.
-
All earthwork on the project including grading for building pads and parking lot.
-
Site asphalt paving.
-
Fire main and domestic water.
-
Septic system.
-
Storm drain improvements.
Project Characteristics
Private Work
Final Contract Amount: $772,000
Owner: Ferrari Carano
General Contractor: Eddinger Enterprises

Clear Lake High School Food Service
8/2017-10/2018


Clear Lake High School Food Service
The Clear Lake High School project consists of demolition, grading, paving, sewer & storm drain work for a new covered patio area at the school.
Project Characteristics
Public Works
Final Contract Amount: $280,000
Owner: Lakeport School District
General Contractor: FRC, Inc.
Starr Road Sidewalk Gap Closure
5/2018-7/2018
Starr Road Sidewalk Gap Closure
The Starr Road project consists of demolition, grading, paving, storm drain, Concrete Sidewalks/Curbs, Striping/Signs & Utility Conduits to widen Starr Road and make room for a bike lane.
Project Characteristics
Public Work
Original Contract Amount: $156,072
Owner: Town of Windsor
General Contractor: Engelke Construction
Lower Lake Elementary TK Portable
12/2017-4/2018
The Lower Lake Elementary School project consists of demolition, grading, paving, sewer, water & storm drain work for a new portable classroom to be installed on their campus.
Project Characteristics
Public Work
Final Contract Amount: $149,500
Owner: Konocti School District
General Contractor: FRC, Inc.
Kelseyville High School Shop
5/2018-2/2019

Kelseyville High School Shop
The Kelseyville project consists of demolition, grading, paving, storm drain, water main & sewer work for a new shop at the Kelseyville High School campus.
Project Characteristics
Public Work
Original Contract Amount: $220,048.50
Owner: Kelseyville Unified School District
General Contractor: FRC, Inc.
Red Custom Crush Expansion
3/2017-12/2017

Red Custom Crush Expansion
The Red Custom Crush Expansion project consists of expanding their wine storage facilities by adding a new storage area and tanks. Our portion of the project is grading, paving, water, Stormtech System & storm drain installation.
Project Characteristics
Private Work
Final Contract Amount: $393,400
Owner: Heath Dolan
General: Eddinger Enterprises
Carole Sauers Building
6/2017-12/2017
Carole Sauers Building
The Carole Sauers Building project consists of expanding their wine storage facilities by adding a new storage area and tanks. Our portion of the project is grading, paving, water, rain gardens, vegetated swales & storm drain installation.
Project Characteristics
Private Work
Original Contract Amount: $363,000
Owner: Carole Sauers
General: Eddinger Enterprises
Ragni-Sing Residence

Ragni-Sing Residence
The Ragni-Sing Residence project consists of joint trench & grading for a new home.
Project Characteristics
Private
Final Contract Amount: $89,100
Owner: Erick Ragni & Emily Sing
General: TBD
Sulpher Fire Disaster Debris Removal
11/2017-12/2017

Sulpher Fire Disaster Debris Removal
The Sulpher Fire Disaster Debris Removal project consists of the cleanup of burnt residences after the devastating 2017 fire in the Clear Lake area of Lake County.
Project Characteristics
Public Work
Contract Amount $673,630
Owner: N/A
General Contractor: Pacific States
Covert Lane Bike Lanes & Median Removal Project
1/201/-3/2018
Covert Lane Bike Lanes & Median Removal Project
The Covert Lane project consists of the removal of median planters & curbs, installation of aggregate base and asphalt, & installation of striping/signage for new bike lanes.
Project Characteristics
Public Work
Original Contract Amount: $114,674.00
Owner: City of Sebastopol
General Contractor: Engelke Construction
Caltrans #04-4K8704
10/2017

Caltrans Project #04-4K8704
The Caltrans 04-4K8704 Emergency Repair consists of driving sheet piling and repaving on a frontage road in Novato where a slide had occurred and caused a large hump to appear in the roadway.
Project Characteristics
Public Work
Original Contract Amount: $291,000
Owner: Caltrans
Caltrans #04-4K2904
8/2017-11/2017

Caltrans Project #04-4K2904
The Caltrans 04-4K2904 Emergency Repair consists of replacing a failed culvert, earthwork and guardrail on Highway 116 between Petaluma and Sonoma
Project Characteristics
Public Work
Original Contract Amount: $800,000
Owner: Caltrans
Cowgirl Creamery
7/2017-10/2017

Cowgirl Creamery
The Cowgirl Creamery project consists of building a new organic chees making facility in Petaluma. Our portion of the project consists of grading, paving, storm drain, trenching and backfill for indoor plumbing.
Project Characteristics
Private Work
Final Contract Amount: $216,500
Owner: Cowgirl Creamery
General: Devcon Construction
Richard Crane Elementary School
2/2017-9/2017
Richard Crane Elementary
The Richard Crane Elementary Project consists the demolition of an existing parking lot, playground and modular buildings to install new buildings along with re-designed parking, playground and new utilities. Our portion of the work included the following:
-
Exterior site demolition and clearing.
-
All earthwork on the project including grading for building pad, exterior flatwork, asphalt and artificial turf areas.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Storm drain system
-
Sewer system
-
Water
Project Characteristics
Public Work
Final Contract Amount: $1,400,000
Owner: Cotati-Rohnert Park School District
General Contractor: Wright Contracting
Westec Pavement Repair
7/2017
Westec Paving Repair
The Westec Paving Repair project consists of removal of existing failed asphalt concrete and structural section and installation of stabilization fabric, thickened Aggregate Base & Asphalt section.
Project Characteristics
Private Work
Original Contract Amount: $177,577
Owner: Joe Belli
Windsor Old Fire Station Parking Lot
5/2017-6/2017

Windsor Old Fire Station Parking Lot
The Windsor Old Fire Station Parking Lot project consists of minor demolition, asphalt grinding & overlay, striping-signage, lighting & fencing.
Project Characteristics
Public Works
Original Contract Amount Lighting & Parking Lot: $72,586
Owner: Town of Windsor
General: Engelke Construction
Windsor Oaks Academy
10/2016-6/2017

Windsor Oaks Academy
The Windsor Oaks Academy Project consists the demolition of an existing parking lot to install two new buildings along with re-designed parking and utilities. Our portion of the work included the following:
-
Exterior site demolition and clearing.
-
All earthwork on the project including grading for building pad, exterior flatwork, asphalt and artificial turf areas.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Storm drain system
-
Sewer system
-
Fire main and domestic water services.
Project Characteristics
Public Work
Final Contract Amount $359,000
Owner: Windsor Unified School District
General Contractor: FRC, Inc.
Clayton Fire Disaster Debris Removal
11/2016-1/2017

Clayton Fire Disaster Debris Removal
The Clayton Fire Disaster Debris Removal project consisted of the cleanup of burnt residences after the devastating 2016 fire in the Lower Lake area of Lake County.
Project Characteristics
Public Work
Contract Amount: $382,000
Owner: N/A
General Contractor: Pacific States
Zialena Winery
5/2015-3/2017

Zialena Winery
The Zialena Winery Project consists of building a winery, hospitality building & parking lot in an existing vineyard in Geyserville. Our portion of the work includes the following:
-
All earthwork on the project including grading for building pads and parking lot.
-
Cement treating building pads.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Fire main and domestic water.
-
Process & domestic waste water systems.
-
Storm drain improvements.
Project Characteristics
Private Work
Final Contract Amount: $789,000
Owner: Mark Mazzoni
General Contractor: Wright Contracting
Caltrans 04A4944
9/2016-10/2016

Caltrans Project #04A4944
The Caltrans 04A4944 consists of replacing a failed culvert on Highway 1 approximately 8 miles north of Jenner.
Project Characteristics
Public Work
Original Contract Amount: $281,000
Owner: Caltrans
Roseland Administration Offices
4/2016-10/2016

Roseland Administration Offices
The Roseland Administration Offices Project consists of a new building addition and parking lot adjacent to the Roseland Creek Elementary School. Our portion of the work includes the following:
-
Exterior site demolition and clearing.
-
All earthwork on the project including grading for building pad and parking lot.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Fire main and domestic water.
-
Septic system.
-
Storm drain improvements.
Project Characteristics
Public Work
Final Contract Amount: $270,000
Owner: Roseland School District
General Contractor: Lathrop Construction
Section L Road Repair Yountville Veterans Home
8/2016-10/2016

Yountville Veterans Home Section L Road Repair
The Section L Road Repair Project consists of removal of failed road section, recompaction of existing storm drain trench, installation of new storm drain, aggregate base and asphalt concrete replacement failed road section and minor striping and signs.
Project Characteristics
Public Work
Final Contract Amount: $160,000
Owner: Department of Veterans Affairs
Healdsburg High School Modernization II
6/2016-8/2016
Healdsburg High School Modernization II
The HHS Modernization II Project consists existing building demolition and the installation of new exterior landscape and hardscape improvements. Our portion of the work includes the following:
-
All earthwork on the project including grading for exterior turf and hardscape areas.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Storm drain improvements.
Project Characteristics
Public Work
Final Contract Amount: $250,000
Owner: Healdsburg Unified School District
General Contractor: Lathrop Construction
Olivet Elementary School
6/2016-8/2016

Olivet Elementary School
The Olivet Elementary School Project consists of interior building improvements, building addition and exterior ADA improvements. Our portion of the work includes the following:
-
Exterior site demolition and clearing.
-
All earthwork on the project including grading for building pad, exterior flatwork and asphalt areas.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Storm improvements
Project Characteristics
Public Work
Final Contract Amount: $98,000
Owner: Piner-Olivet Union School District
General Contractor: Wright Contracting
Brown Wine Storage
8/2015-8/2016

Brown Wine Storage Building
The Brown Wine Storage Building Project consists of a new building addition to the Sauers Business Park in Healdsburg. Our portion of the work includes the following:
-
Exterior site demolition and clearing.
-
All earthwork on the project including grading for building pad and parking lot.
-
Cement treating building pad.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Off-site and on-site joint trench.
-
Fire main and domestic water.
-
Septic system.
-
Storm drain improvements.
-
Bio-retention basin.
Project Characteristics
Private Work
Original Contract Amount: $305,000
Owner: Marc & Cathy Brown
General Contractor: Eddinger Enterprises
Completion: August 2016
Fitch Mountain School Pavers Project
6/2016-8/2016
The Fitch Mountain School Pavers Project
The Fitch Mountain School Project is to eliminate the decomposed granite paving in planters and place pavers. Our work consisted of removing the decomposed granite, making a dirt subgrade and installing base rock for under the pavers.
Project Characteristics
Public Work
Original Contract Amount: $22,900.00
General Contractor: FRC Inc.
Owner: Healdsburg Unified School District

Brown Commercial Building
8/2015-8/2016

Brown Commercial Building
The Brown Commercial Building Project consists of a new building addition to the Sauers Business Park in Healdsburg. Our portion of the work includes the following:
-
Exterior site demolition and clearing.
-
All earthwork on the project including grading for building pad and parking lot.
-
Cement treating building pad.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Off-site and on-site joint trench.
-
Fire main and domestic water.
-
Septic system.
-
Storm drain improvements.
-
Bio-retention basin.
Project Characteristics
Private Work
Final Contract Amount: $465,000
Owner: Marc & Cathy Brown
General Contractor: Eddinger Enterprises
Healdsburg High School Modernization
6/2015-5/2016

Healdsburg High School Modernization
The Healdsburg High School Project consisted of the modernization of 4 existing building with all new utilities. A new building pad with utilities and extensive exterior new landscape features. Our portion of the work included the following:
-
Exterior site demolition and clearing.
-
All earthwork on the project including grading for building pad, exterior flatwork, asphalt and artificial turf areas.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Storm drain system
-
Sewer system
-
Fire main and domestic water services.
Project Characteristics
Public Work
Contract Amount: $1,020,000
Owner: Healdsburg Unified School District
General Contractor: Lathrop Construction Associates, Inc.
Big John's Market
10/2014-4/2016


Big John's Market
The Big John's project consisted of demolition two buildings to make room for an expanded parking area and expansion of the Big John's Market. Our portion of the work was the following:
-
Exterior site demolition and clearing.
-
Building Demolition.
-
All earthwork on the project including grading for building pad, exterior flatwork, parking lot & driveway.
-
Cement treat building pad.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Storm drain system
-
Sewer system
-
Fire main and domestic water services.
-
Electrical trenching & backfill.
Project Characteristics
Private Work
Contract Amount: $1,300,000
Owner: John Lloyd
General Contractor: Eddinger Enterprises
Benovia Winery
6/2014-4/2016


Benovia Winery
The Benovia Winery project consisted of demolition of one building to make room for a new winery production facility. Our portion of the work was the following:
-
Building Demolition.
-
All earthwork on the project including grading for building pad, exterior flatwork, parking lot & driveway.
-
Aggregate base installation under all exterior flatwork and asphalt.
-
Site asphalt paving.
-
Storm drain system
-
Sewer system, Advantex system.
-
Fire main and domestic water services.
-
Fire storage tank.
-
Erosion Control
Project Characteristics
Private Work
Contract Amount: $760,000
Owner: Benovia Winery
General Contractor: Ledcor Group
Completion: April 2016
Smart Train
2/2015-2/2016


Smart Train
The Smart Train project was to create a new maintenance facility in Santa Rosa for the trains, work at various railroad crossing and future Smart Train stations. Our portion of the work was the following:
-
Grading for railroad tracks Santa Rosa maintenance station.
-
Drainage system and ballast installation under railroad tracks at the Santa Rosa maintenance station.
-
Electrical & Gas trenching and backfill Santa Rosa maintenance station.
-
Paving at various railroad crossings and tunnel fire access road San Rafael.
-
Build construction access roads various stations Sonoma County.
Project Characteristics
Public Work
Contract Amount: $800,000
Owner: SMART
General Contractor: Shimmick Construction
Lake County Emergency Fire Cleanup
11/2015-1/2016

Lake County Emergency Fire Cleanup
The Lake County emergency fire cleanup project consisted of the cleanup of burnt residences after the devastating 2015 fire in Middletown and on Cobb Mountain. Engelke Construction had up to 3 five man crews on the cleanup. Each crew consisted of two operators, three laborers an excavator and skidsteer.
Project Characteristics
Public Work
Contract Amount: $850,000
Owner: N/A
General Contractor: Pacific States
Healdsburg Avenue Bridge Retrofit
12/2015-2/2016

Healdsburg Avenue
Bridge Retrofit
The Healdsburg Avenue Bridge project was to retrofit the existing bridge and install a new water main. Our portion of the work was the following:
-
Install new water main on both sides of the bridge.
-
Testing of the main installed by us and the main on the bridge.
-
Tie in new system to existing water system.
Project Characteristics
Public Work
Contract Amount: $133,000
Owner: City of Healdsburg
General Contractor: Granite Construction
Our Older Projects
Laney Thorton Dam House Site
2006




Lamar & Norma Hunt Reservoir
2005



Geysers Recharge
2003




All projects below by Engelke Brothers Construction
Boschetto Residence
1999-2000









Carson Warner Memorial Skatepark
1999










Joe Montana Ranch
1998








Magnolia Subdivision
1996



Russian River Rip Rap
1995


Caltrans Hwy 36 Red Bluff
1992







Syar Healdsburg
1990



Drew Commercial Building
1990


Santa Rosa Jr. College
1989




418 B Street Santa Rosa
1989




Swenson Building (future Bear Republic Brewing Co. home)
1987-1988







National Guard Armory Benecia
1988




Hudson Street Healdsburg
1988


Redwood Lumber Company Windsor
1987



Big O Tires Healdsburg
1987


Healdsburg Public Library
1985-1986




Laurel Springs Subdivision
1985