Caltrans Emergency Project
04-3Y9204
7/24-11/24

download (1).png
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Caltrans Emergency Project
04-3Y9204

The Caltrans 04-3Y9204 Project consists of the installation of an anchored wired meshed system at an ongoing slide on Highway 26 above Calistoga.

Project Characteristics

Public Work

Final Contract Amount  $800,000

Owner: Caltrans

General Contractor: Engelke Construction

Healdsburg Elementary School Playground Improvements
6/24-8/24

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
images (1).png
Healdsburg Elementary School Playground Improvements
 

The Healdsburg Elementary School project consists demolition, grading & paving  for a new playground area.

Project Characteristics

Public Work

Final Contract Amount  $146,000

Owner: Healdsburg Unified School District

General Contractor: GCCI, Inc.

Sonoma Valley High School Science Building
6/23-8/24

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
images (1).png
Sonoma Valley High School Science Building
 

The SVHS Valley High School Science Building  project consists of clearing, demolition, grading,  underground utility installation & paving for a new science building and new parking lot.

Project Characteristics

Public Work

Final Contract Amount $1,048,000

Owner: Sonoma Valley Unified School District

General Contractor: GCCI

Fitch Mountain Elementary School
Site Improvements
6/24-8/24

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
FRC from AJ Printing-1.jpg
Fitch Mountain Elementary School Site Improvements
 

The Fitch Mountain Elementary  project consists demolition, grading & paving for new ADA Improvments, Playground & New Landscaping.

Project Characteristics

Public Work

Final Contract Amount  $259,700

Owner: Healdsburg Unified School District

General Contractor: FRC, Inc.

Healdsburg High School Frost Hall Improvements
6/24-8/24

images (1).png
Healdsburg High School Frost Hall Improvements
 

The Healdsburg High School Frost Hall project consists demolition, grading & storm drain work for ADA ramp improvements.

Project Characteristics

Public Work

Final Contract Amount  $78,500

Owner: Healdsburg Unified School District

General Contractor: GCCI, Inc.

Cali Calmecac Academy
Increments 1-3
4/22-8/24

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Cali Calmecac Academy
Increments 1-3
 

The Cali Calmecac project project consists of demolition, grading,  underground utility installation & paving for temporary student facilities and installation of infrastructure for a new 2 story building and 4 transitional Kindergarten buildings.

Project Characteristics

Public Work

Final Contract Amount $2,170,000

Owner: Windsor Unified School District

General Contractor: Arntz Builders

Caltrans 04-3Y5304
11/23-4/24

Caltrans 04-3Y5304
 

The Caltrans Emergency Timber Cove project consists of the installation of a soldier pile wall and all associated work for it's installation.  We are a subcontractor on the project working for Gordon N. Ball.  Our portion of the work includes storm drain installation and earthwork.

Project Characteristics

Public Work

Final Contract Amount $456,400

Owner: Caltrans

General Contractor: Gordon N. Ball

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
GNB-Logo-Small1.png

Caltrans 01-0N4204
9/23-6/24

Caltrans 01-0N4204
 

The Caltrans Emergency Dos Rios  project consists of the installation of a welded steel pipe culvert & associated road repairs.  We are the General Contractor & performing most of the work.

Project Characteristics

Public Work

Final Contract Amount  $1,200,000

Owner: Caltrans

General Contractor: Engelke Construction

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

Oak Manor Elementary School
6/23-4/24

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
FRC from AJ Printing-1.jpg
Oak Manor Elementary
 

The Oak Manor Elementary project project consists of clearing, demolition, grading,  underground utility installation & paving for 2 new school buildings and a playground..

Project Characteristics

Public Work

Final Contract Amount $794,500

Owner: Ukiah Unified School District

General Contractor: FRC, Inc.

Nokomis Elementary School
6/23-4/24

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
FRC from AJ Printing-1.jpg
Nokomis Elementary
 

The Nakomis Elementary project project consists of demolition, grading,  underground utility installation & paving for a new school building, ADA parking improvements and a playground.

Project Characteristics

Public Work

Final Contract Amount $510,400

Owner: Ukiah Unified School District

General Contractor: FRC, Inc.

Foothill Gathering Areas & Parking
Lot Improvements
10/2023-1/2024

Foothills Gathering Areas & Parking Improvements
 

The Foothills project consists demolition, grading, concrete installation, steel puncheon bridge installation, landscaping, fencing, striping & signage at Foothills Regional Park in Windsor.  New pathways, sidewalks, gathering areas & ADA parking improvements are being constructed.  We are the General contractor and performing all demolition and grading on the project.

Project Characteristics

Public Work

Final Contract Amount  $522,540

Owner: County of Sonoma

General Contractor: Engelke Construction

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
n.jpg

Calistoga Jr/Sr High School
Interim Housing
12/2023-1/2024

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
j.jpg
Calistoga Jr/Sr High School Interim Housing
 

The Interim Housing project consists demolition, grading & storm drain work for the installation of temporary relocatable classrooms.  

Project Characteristics

Public Work

Final Contract Amount  $110,810

Owner: Calistoga Unified School District

General Contractor: Landmark Construction

Roseland Accelerated Middle School
Multi Purpose Addition
1/2023-8/2023

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
images (1).png
Roseland Accelerated Middle School
Multi Purpose Addition
 

The Rams project project consists of demolition, grading, Underground Utilities & ADA parking improvements for a multi purpose building addition.

Project Characteristics

Public Work

Final Contract Amount $132,975

Owner: Roseland Unified School District

General Contractor: GCCI

Ukiah Unified School District Fencing Projects
6/23-8/23

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
FRC from AJ Printing-1.jpg
download.jpg
UUSD Fencing Projects
 

The UUSD fencing  projects consists of demolition, grading & paving for ADA and fence improvements at the South Valley High School, Ukiah High School and Eagle Peak Middle School campuses.

Project Characteristics

Public Work

Final Contract Amount $217,892

Owner: Ukiah Unified School District

General Contractor: FRC, Inc.

Potter Valley Outdoor Learning Center
10/22-4/23

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
images (1).png
Potter Valley Outdoor Learning Center
 

The Potter Valley Outdoor Learning Center project project consists of demolition, grading & paving for a covered outdoor basketball court & ADA parking improvements.

Project Characteristics

Public Work

Final Contract Amount $122,827

Owner: Potter Valley Unified School District

General Contractor: GCCI

Prestwood Elementary
6/12-12/22

Prestwood Elementary
 

The Prestwood Elementary project project consists of demolition, grading,  underground utility installation & paving for a new building addition.

Project Characteristics

Public Work

Final Contract Amount $365,900

Owner: Sonoma Valley Unified School District

General Contractor: Lathrop

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Lathrop+Construction+-+Standard+Logo.jpg

Taylor/Healdsburg Sr Living Frontage
9/22-11/22

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Taylor/Healdsburg Sr Living Frontage
 

The Taylor/Healdsburg Sr Living  project project consists of demolition, grading, underground utility installation, Sidewalk, Curb Gutter & AC Paving for the frontages of the Taylor Residence & Healdsburg Sr Living. 

Project Characteristics

Private Work

Final Contract Amount $163,200

Owner: Matt & Steven Taylor/Pacifica Properties

General Contractor: Engelke Construction

Healdsburg Lumber
7/21-12/22

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
hlc-home.png
eddinger-new-web500.png
Healdsburg Lumber
 

The Healdsburg Lumber project project consists of demolition, grading, underground utility installation & paving for their new facility on Healdsburg Ave/Old Redwood Hwy. 

Project Characteristics

Private Work

Final Contract Amount $1,459,000

Owner: Eric Ziedrich

General Contractor: Eddinger Enterprises

Honor Mansion
11/21-8-22

eddinger-new-web500.png
download (1).jpg
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Honor Mansion
 

The Honor Mansion project project consists of demolition, grading, underground utility installation & paving for new additions to the historic Honor Mansion in Healdsburg.  The improvements include the widening of Grove Street in front of the mansion.

Project Characteristics

Private Work

Final Contract Amount $1,300,000

Owner:  Craig Ramsey

General Contractor: Eddinger Enterprises

Healdsburg Jr High Field Modernization
10/21-8-22

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
images (1).png
Healdsburg Jr High
Field Modernization
 

The Healdsburg Jr High School project project consists of demolition, grading, Storm Drain & Extensive Subdrainage System for the New Artificial Turf Field and Surrounding Improvements.

Project Characteristics

Public Work

Final Contract Amount $1,689,000

Owner: Healdsburg Unified School District

General Contractor: GCCI Inc. General Contractors

Upper Lake High School
1/22-8/22

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
download.png
Upper Lake
High School
 

The Upper Lake High School project project consists of demolition, grading, underground utility installation & paving for 2 New buildings.  The project also includes a new bus dropoff for the students.

Project Characteristics

Public Work

Final Contract Amount $1,241,000

Owner: Upper Lake Unified School District

General Contractor: JL Modular

Napa Valley Language Academy
6/22-8/22

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
05_wrightcontractinginc.jpg
Napa Valley Language Academy
 

The NVLA project project consists of demolition, grading & paving for a for ADA improvements throughout the campus.

Project Characteristics

Public Work

Final Contract Amount $523,500

Owner: Napa Valley Unified School District

General Contractor: Wright Contracting

Evergreen Elementary School
Modernization & New Multi Purpose Building
6/2020-4/2022

05_wrightcontractinginc.jpg
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Evergreen Elementary School
Modernization & New Multi Purpose Building
 

The Evergreen Elementary School project consists of demolition, grading, paving, storm drain, water main & sewer work  on the Evergreen Elementary campus for new multi purpose building, 2 new parking lots and new playground.

Project Characteristics

Public Work

Final Contract Amount $1,771,900

Owner: Cotati-Rohnert Park Unified School District

General Contractor: Wright Contracting

Upper Lake Elementary School
6/2021-3/2022

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
download.png
download.jpg
Upper Lake
Elementary School
 

The Upper Lake Elementary School project project consists of demolition, grading, underground utility installation & paving for 3 new buildings kindergarten, student services & new student center. Improvements include a brand new parking lot to serve the new buildings.

Project Characteristics

Public Work

Final Contract Amount $1,026,600

Owner: Upper Lake Unified School District

General Contractor: JL Modular

Caltrans 04-2W5004
Emergency Culvert Replacement
1/2022-2/2022

Caltrans 04-2W5004

The Caltrans 04-2W5004 is an emergency project consisting of replacing a failed culvert  on Highway 101 in Sausalito

Project Characteristics

Public Work

Final Contract Amount: $333,000

Owner: Caltrans

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

Napa Valley Unified School District
5 Modernizations
6/21-9/21

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
05_wrightcontractinginc.jpg
Napa Logo.png
NVUSD
5 Modernizations
 

The NVUSD 5 Modernization project project consists of demolition, grading & storm drain for a new ADA Improvements on the Donaldson Way Elementary, Alta Heights Elementary & Silverado Middle School Campuses in Napa and American Canyon

Project Characteristics

Public Work

Final Contract Amount $575,000

Owner: Napa Valley Unified School District

General Contractor: Wright Contracting

Bricoleur Vineyards
9/16-20/20

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Bricoleur Vineyards
 

The Hanson Ranch project consists of building a new winery facility in Windsor.  Our portion of the project is grading, paving, lime treating, erosion control & storm drain installation.

Project Characteristics

Private Work

Final Contract Amount:  $1,868,000

Owner: Mark Hanson

Novato High School
7/19-5/21
 

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
05_wrightcontractinginc.jpg
Novato High School
 

The Novato High School project consists of demolition, grading, paving, storm drain, water main & sewer work  on the Novato High School campus for new science & arts buildings.

Project Characteristics

Public Work

Final Contract Amount $2,496,000

Owner: Novato Unified School District

General Contractor: Wright Contracting

The Matheson
9/19-4/21

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
eddinger-new-web500.png
The Matheson
 

The Matheson project consists of demolition, grading, paving and underground utilities for the new Matheson Restaurant.

Project Characteristics

Private Work

Final Contract Amount $779,000

Owner: Craig Ramsey

General Contractors: Eddinger Enterprises

Healdsburg Jr High
Gym Modernization
5/20-10/20

20200526_140703.jpg
20200526_140659.jpg
images (1).png
Healdsburg Jr High
Gym Modernization
 

The Healdsburg Jr High School project consists of demolition, grading & storm drain for a new ADA entrance to the Gymnasium.

Project Characteristics

Public Work

Final Contract Amount: $56,665

Owner: Healdsburg Unified School District

General Contractor: GCCI

Santa Rosa Memorial Hospital Medical Building

12/19-5/20

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
1310_55b0117084fdd5.78527294_13.jpeg
download.jpg
SRMH Medical Building
 

The SRMH Medical Building project consists of trenching & backfill for plumbing, electrical & gas.

Project Characteristics

Private Work

Final Contract $165,000

Owner: Santa Rosa Memorial Hospital

General Contractors: Indoor Environmental Services & Rex Moore

SRJC Petaluma Campus Building

6/19-10-20

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
download.png
SRJC Petaluma Campus Science Building

The SRJC Petaluma Campus project consists of demolition, grading, paving, storm drain, water main & sewer work  on the SRJC Petaluma campus for infrastructure to a science building and parking area.

Project Characteristics

Public Work

Final Contract Amount $717,000

Owner: Santa Rosa Jr. College

General Contractor: JL Modular/Construction

Healdsburg High School Gymnasium & Locker Room

6/19-9/20

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
601380_111914705626400_412458112_n.jpg
Lathrop+Construction+-+Standard+Logo.jpg
HHS Gymnasium
& Locker Room
 

The Healdsburg High School project consists of demolition, grading, paving, storm drain, water main & sewer work  on the Healdsburg High School campus in Healdsburg for their new gymnasium.

Project Characteristics

Public Work

Final Contract Amount $2,029,000

Owner: Cotati-Rohnert Park Unified School District

General Contractor: Lathrop Construction

Carole Sauers Building 2019

10/19-9/20

Carole Sauers Building 2019
 

The Carole Sauers project consists of demolition, grading, paving and underground utilities for a new building.

Project Characteristics

Private Work

Final Contract Amount $458,200

Owner: Carole Sauers

General Contractors: Eddinger Enterprises

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
eddinger-new-web500.png

SVHS Culinary Arts Modernization

6/20-11/20

SVHS Culinary Arts
Modernization
 

The Sonoma Valley High School project consists of demolition, grading & storm drain for a new ADA entrance to the Gymnasium.

Project Characteristics

Public Work

Final Contract Amount $417,000

Owner: Sonoma Valley Unified School District

General Contractor: GCCI

20200603_095101.jpg
20200603_095105.jpg
images (1).png

NVUSD Modernizations

6/20-9/20

NVUSD
Modernization
 

The NVUSD Modernization project consists of demolition, grading & paving for a new ADA improvements.

Project Characteristics

Public Work

Final Contract Amount $491,000

Owner: Napa Valley Unified School District

General Contractor: Wright Contracting

20200720_081555.jpg
20200720_081504.jpg
05_wrightcontractinginc.jpg
Napa Logo.png

Caltrans OQ7004

Emergency Culvert Replacement

4/20-10/20

Caltrans OQ7004

The Caltrans 04-2Q9504 is an emergency project consisting of replacing a failed culvert  on Highway 1 near Jenner.

Project Characteristics

Public Work

Final Contract Amount: $172,000

Owner: Caltrans

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.

Finishing Kitchens

1/20-4/20

Napa Logo.png
Arntz Logo.jpg
Finishing Kitchens
 

The Finishing Kitchens project consists of demolition, grading, paving, & sewer work  on the Vichy Elementary & Browns Valley Elementary School Campuses for new school Kitchens & ADA improvements.

Project Characteristics

Public Work

Final Contract Amount: $256,000

Owner: Napa Valley Unified School District

General Contractor: Arntz Builders

Caltrans 04-4Q4104

Emergency Slide Repair

9/19-3/20

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Caltrans 04-4Q4104

The Caltrans 04-4Q4104 is an emergency project consisting of the installation of a sheet pile wall, rock slope protection, storm drainage, paving & striping.

Project Characteristics

Public Work

Final Contract Amount: $428,000

Owner: Caltrans

download (1).png

Technology High School

1/19-12/19

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
05_wrightcontractinginc.jpg
Technology High School
 

The Technology High School project consists of demolition, grading, paving, storm drain, water main & sewer work  on the Technology High School campus in Rohnert Park.

Project Characteristics

Public Work

Original Contract Amount $2,954,589

Owner: Cotati-Rohnert Park Unified School District

General Contractor: Wright Contracting

Burge Building

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Burge Building

The Burge project consists of demolition, grading, paving, storm drain & water main work for a new distillery in Rohnert Park

Project Characteristics

Private Work

Original Contract Amount: $228,400

Owner: Rental Center Properties

General Contractor: 5280 CM

PSTC Multi Purpose Building SRJC Windsor Campus

9/18-6/19

20190130_170523.jpg
download.png
PSTC Multi Purpose Building SRJC Windsor Campus

The PSTC Multi Purpose Building project consists of demolition, grading, paving, storm drain, water main & sewer work  on the SRJC Windsor campus for infrastructure to a new multi purpose building.  The work also includes ADA improvements throughout the existing campus.

Project Characteristics

Public Work

Final Contract Amount: $408,400

Owner: Santa Rosa Jr. College

General Contractor: JL Modular/Construction

1111 Main St Helena

5/19-6/19

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
1111 Main St Helena

The 1111 Main Project consists of grading, paving and sewer work.​

Project Characteristics

PrivateWork

Final Contract Amount: $70,800

General Contractor: 5280 CM

Golden State Cider

2/19-5/19

20190206_140719.jpg
eddinger-new-web500.png
Golden State Cider
 

The Golden State Cider project consists demolition, grading, paving & electrical conduit work for their new manufacturing facility in Healdsburg.

Project Characteristics

PrivateWork

Final Contract Amount $77,800

Owner: Golden State Cider

General Contractor: Eddinger Enterprises

Montage Healdsburg

11/18-5/19

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
05_wrightcontractinginc.jpg
Montage Healdsburg
 

The Montage Healdsburg project consists of grading & erosion control work for the new resort in Healdsburg.

Project Characteristics

Private Work

Final Contract Amount $800,000

Owner: Montage Hotels & Resorts

General Contractor: Wright Contracting

Terrace Middle School

      2/2018-2/2019

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Terrace_Logo_1_RGB_02.png
FRC from AJ Printing-1.jpg
Terrace Middle School
 

The Terrace Middle School project consists of demolition, grading, paving, sewer & storm drain work for a new 7 new buildings & expansive decorative courtyard.

Project Characteristics

Public Work

Final Contract Amount: $871,427

Owner: Lakeport School District

General Contractor: FRC, Inc.

Healdsburg High School Track & Field Modernization

5/2018-10/2018

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
601380_111914705626400_412458112_n.jpg
FRC from AJ Printing-1.jpg
Healdsburg High School Track & Field Modernization
 

The Healdsburg High School project consists of demolition, grading, paving, storm drain, water main & sewer work  on the Healdsburg High School campus.

Project Characteristics

Public Work

Final Contract Amount 1,809,000

Owner: Healdsburg Unified School District

General Contractor: FRC, Inc.

Caltrans 04-2Q9504

Emergency Culvert Replacement

9/2018-10/2018

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Caltrans-Logo.jpg
Caltrans 04-2Q9504

The Caltrans 04-2Q9504 is an emergency project consisting of replacing a failed culvert and installing a headwall on Highway 1 near Olema.

Project Characteristics

Public Work

Original Contract Amount: $250,00

Owner: Caltrans

Engelke Construction Yard & Office

    5/2018-12/2018

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
logo_plain.gif
eddinger-new-web500.png
Engelke Construction Yard & Office
 

The Engelke Construction Yard & Office project consists of building our 6,000 SF office & shop along with parking for our employees and parking for our equipment.  Our portion of the project  is grading, paving, water, sewer, Stormtech system & storm drain installation.

Project Characteristics

Private Work

Owner: Jerry & Joanna Engelke

General: Eddinger Enterprises

Vintner's Inn

8/2016-10/2018

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Vintner's Inn
 

The Vintner's Inn consists of two new hotel buildings, a spa building, pool and parking lot.  Our portion of the work includes the following:

  • Exterior site demolition.

  • All earthwork on the project including grading for building pads and parking lot.

  • Site asphalt paving.

  • Fire main and domestic water.

  • Septic system.

  • Storm drain improvements.

Project Characteristics

Private Work

Final Contract Amount:  $772,000

Owner: Ferrari Carano

General Contractor: Eddinger Enterprises

eddinger-new-web500.png

Clear Lake High School Food Service

8/2017-10/2018

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
22141028_619504604839891_626826846056914
FRC from AJ Printing-1.jpg
Clear Lake High School Food Service
 

The Clear Lake High School project consists of demolition, grading, paving, sewer & storm drain work for a new covered patio area at the school.

Project Characteristics

Public Works

Final Contract Amount: $280,000

Owner: Lakeport School District

General Contractor: FRC, Inc.

Starr Road Sidewalk Gap Closure

5/2018-7/2018

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Starr Road Sidewalk Gap Closure
 

The Starr Road project consists of demolition, grading, paving, storm drain, Concrete Sidewalks/Curbs, Striping/Signs & Utility Conduits to widen Starr Road and make room for a bike lane.

Project Characteristics

Public Work

Original Contract Amount: $156,072

Owner: Town of Windsor

General Contractor: Engelke Construction

Lower Lake Elementary TK Portable
12/2017-4/2018

The Lower Lake Elementary School project consists of demolition, grading, paving, sewer, water & storm drain work for a new portable classroom to be installed on their campus.

Project Characteristics

Public Work

Final Contract Amount: $149,500

Owner: Konocti School District

General Contractor: FRC, Inc.

Kelseyville High School Shop

5/2018-2/2019

Kelseyville High School Shop
 

The Kelseyville project consists of demolition, grading, paving, storm drain, water main & sewer work for a new shop at the Kelseyville High School campus.

Project Characteristics

Public Work

Original Contract Amount: $220,048.50

Owner: Kelseyville Unified School District

General Contractor: FRC, Inc.

Red Custom Crush Expansion

3/2017-12/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
eddinger-new-web500.png
Red Custom Crush Expansion
 

The Red Custom Crush Expansion project consists of expanding their wine storage facilities by adding a new storage area and tanks.  Our portion of the project  is grading, paving, water, Stormtech System & storm drain installation.

Project Characteristics

Private Work

Final Contract Amount:  $393,400

Owner: Heath Dolan

General: Eddinger Enterprises

Carole Sauers Building

6/2017-12/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Carole Sauers Building
 

The Carole Sauers Building project consists of expanding their wine storage facilities by adding a new storage area and tanks.  Our portion of the project  is grading, paving, water, rain gardens, vegetated swales & storm drain installation.

Project Characteristics

Private Work

Original Contract Amount:  $363,000

Owner: Carole Sauers

General: Eddinger Enterprises

Ragni-Sing Residence

Ragni-Sing Residence

The Ragni-Sing Residence project consists of joint trench & grading for a new home.

Project Characteristics

Private

Final Contract Amount:  $89,100

Owner: Erick Ragni & Emily Sing

General: TBD

Sulpher Fire Disaster Debris Removal

11/2017-12/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
pacificstatesLogo_original-e146436993874
Sulpher Fire Disaster Debris Removal
 

The Sulpher Fire Disaster Debris Removal project consists of the cleanup of burnt residences after the devastating 2017 fire in the Clear Lake area of Lake County.

Project Characteristics

Public Work

Contract Amount $673,630

Owner: N/A

General Contractor: Pacific States

Covert Lane Bike Lanes & Median Removal Project

1/201/-3/2018

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Covert Lane Bike Lanes & Median Removal Project
 

The Covert Lane project consists of the removal of median planters & curbs, installation of aggregate base and asphalt, & installation of striping/signage for new bike lanes.

Project Characteristics

Public Work

Original Contract Amount: $114,674.00

Owner: City of Sebastopol

General Contractor: Engelke Construction

Caltrans #04-4K8704

10/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Caltrans-Logo.jpg
Caltrans Project #04-4K8704
 

The Caltrans 04-4K8704 Emergency Repair consists of driving sheet piling and repaving on a frontage road in Novato where a slide had occurred and caused a large hump to appear in the roadway.

Project Characteristics

Public Work

Original Contract Amount:  $291,000

Owner: Caltrans

Caltrans #04-4K2904

8/2017-11/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Caltrans-Logo.jpg
Caltrans Project #04-4K2904
 

The Caltrans 04-4K2904 Emergency Repair consists of replacing a failed culvert, earthwork and guardrail on Highway 116 between Petaluma and Sonoma 

Project Characteristics

Public Work

Original Contract Amount:  $800,000

Owner: Caltrans

Cowgirl Creamery

7/2017-10/2017

Cowgirl Creamery
 

The Cowgirl Creamery project consists of building a new organic chees making facility in Petaluma.  Our portion of the project consists of grading, paving, storm drain, trenching and backfill for indoor plumbing.

Project Characteristics

Private Work

Final Contract Amount: $216,500

Owner: Cowgirl Creamery

General: Devcon Construction

Richard Crane Elementary School

2/2017-9/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Richard Crane Elementary
 

The Richard Crane Elementary Project consists the demolition of an existing parking lot, playground and modular buildings to install new buildings along with re-designed parking, playground and new utilities. Our portion of the work included the following:

  • Exterior site demolition and clearing.

  • All earthwork on the project including grading for building pad, exterior flatwork, asphalt and artificial turf areas.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Storm drain system

  • Sewer system

  • Water

Project Characteristics

Public Work

Final Contract Amount: $1,400,000

Owner: Cotati-Rohnert Park School District

General Contractor: Wright Contracting

Westec Pavement Repair

7/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Westec Paving Repair
 

The Westec Paving Repair project consists of removal of existing failed asphalt concrete and structural section and installation of stabilization fabric, thickened Aggregate Base & Asphalt section. ​

Project Characteristics

Private Work

Original Contract Amount:  $177,577

Owner: Joe Belli

Windsor Old Fire Station Parking Lot

5/2017-6/2017

Windsor Old Fire Station Parking Lot
 

The Windsor Old Fire Station Parking Lot project consists of minor demolition, asphalt grinding & overlay, striping-signage, lighting & fencing.

Project Characteristics

Public Works

Original Contract Amount Lighting & Parking Lot:  $72,586

Owner: Town of Windsor

General: Engelke Construction

Windsor Oaks Academy

10/2016-6/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
FRC from AJ Printing-1.jpg
Windsor Oaks Academy
 

The Windsor Oaks Academy Project consists the demolition of an existing parking lot to install two new buildings along with re-designed parking and utilities. Our portion of the work included the following:

  • Exterior site demolition and clearing.

  • All earthwork on the project including grading for building pad, exterior flatwork, asphalt and artificial turf areas.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Storm drain system

  • Sewer system

  • Fire main and domestic water services.

Project Characteristics

Public Work

Final Contract Amount $359,000

Owner: Windsor Unified School District

General Contractor: FRC, Inc.

Clayton Fire Disaster Debris Removal

11/2016-1/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
pacificstatesLogo_original-e146436993874
Clayton Fire Disaster Debris Removal
 

The Clayton Fire Disaster Debris Removal project consisted of the cleanup of burnt residences after the devastating 2016 fire in the Lower Lake area of Lake County.

Project Characteristics

Public Work

Contract Amount: $382,000

Owner: N/A

General Contractor: Pacific States

Zialena Winery

5/2015-3/2017

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
05_wrightcontractinginc.jpg
Zialena Winery
 

The Zialena Winery Project consists of building a winery, hospitality building & parking lot in an existing vineyard in Geyserville.  Our portion of the work includes the following:​

  • All earthwork on the project including grading for building pads and parking lot.

  • Cement treating building pads.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Fire main and domestic water.

  • Process & domestic waste water systems.

  • Storm drain improvements.

Project Characteristics

Private Work

Final Contract Amount:  $789,000

Owner: Mark Mazzoni

General Contractor: Wright Contracting

Caltrans 04A4944

9/2016-10/2016

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Caltrans-Logo.jpg
Caltrans Project #04A4944
 

The Caltrans 04A4944 consists of replacing a failed culvert on Highway 1 approximately 8 miles north of Jenner.

Project Characteristics

Public Work

Original Contract Amount:  $281,000

Owner: Caltrans

Roseland Administration Offices

4/2016-10/2016

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Lathrop+Construction+-+Standard+Logo.jpg
Roseland Administration Offices
 

The Roseland Administration Offices Project consists of a new building addition and parking lot adjacent to the Roseland Creek Elementary School.  Our portion of the work includes the following:

  • Exterior site demolition and clearing.

  • All earthwork on the project including grading for building pad and parking lot.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Fire main and domestic water.

  • Septic system.

  • Storm drain improvements.

Project Characteristics

Public Work

Final Contract Amount:  $270,000

Owner: Roseland School District

General Contractor: Lathrop Construction

Section L Road Repair Yountville Veterans Home

8/2016-10/2016

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
download.png
Yountville Veterans Home Section L Road Repair
 

The Section L Road Repair Project consists of removal of failed road section, recompaction of existing storm drain trench, installation of new storm drain, aggregate base and asphalt concrete replacement failed road section and minor striping and signs.

Project Characteristics

Public Work

Final Contract Amount:  $160,000

Owner: Department of Veterans Affairs

Healdsburg High School Modernization II

6/2016-8/2016

!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Healdsburg High School Modernization II
 

The HHS Modernization II Project consists existing building demolition and the installation of new exterior landscape and hardscape improvements.  Our portion of the work includes the following:​

  • All earthwork on the project including grading for exterior turf and hardscape areas.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Storm drain improvements.

Project Characteristics

Public Work

Final Contract Amount:  $250,000

Owner: Healdsburg Unified School District

General Contractor: Lathrop Construction

Olivet Elementary School
6/2016-8/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
05_wrightcontractinginc.jpg
Olivet Elementary School
 

The Olivet Elementary School Project consists of interior building improvements, building addition and exterior ADA improvements.  Our portion of the work includes the following:

  • Exterior site demolition and clearing.

  • All earthwork on the project including grading for building pad, exterior flatwork and asphalt areas.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Storm improvements

Project Characteristics

Public Work

Final Contract Amount:  $98,000

Owner: Piner-Olivet Union School District

General Contractor: Wright Contracting

Brown Wine Storage
8/2015-8/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
eddinger-new-web500.png
Brown Wine Storage Building
 

The Brown Wine Storage Building Project consists of a new building addition to the Sauers Business Park in Healdsburg.  Our portion of the work includes the following:

  • Exterior site demolition and clearing.

  • All earthwork on the project including grading for building pad and parking lot.

  • Cement treating building pad.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Off-site and on-site joint trench.

  • Fire main and domestic water.

  • Septic system.

  • Storm drain improvements.

  • Bio-retention basin.

Project Characteristics

Private Work

Original Contract Amount:  $305,000

Owner: Marc & Cathy Brown

General Contractor: Eddinger Enterprises

Completion: August 2016

Fitch Mountain School Pavers Project
6/2016-8/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
The Fitch Mountain School Pavers Project
 

The Fitch Mountain School Project is to eliminate the decomposed granite paving in planters and place pavers.  Our work consisted of removing the decomposed granite, making a dirt subgrade and installing base rock for under the pavers.

Project Characteristics

Public Work

Original Contract Amount:  $22,900.00

General Contractor: FRC Inc.

Owner: Healdsburg Unified School District

FRC from AJ Printing-1.jpg
Brown Commercial Building
8/2015-8/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
eddinger-new-web500.png
Brown Commercial Building
 

The Brown Commercial Building Project consists of a new building addition to the Sauers Business Park in Healdsburg.  Our portion of the work includes the following:

  • Exterior site demolition and clearing.

  • All earthwork on the project including grading for building pad and parking lot.

  • Cement treating building pad.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Off-site and on-site joint trench.

  • Fire main and domestic water.

  • Septic system.

  • Storm drain improvements.

  • Bio-retention basin.

Project Characteristics

Private Work

Final Contract Amount:  $465,000

Owner: Marc & Cathy Brown

General Contractor: Eddinger Enterprises

Healdsburg High School Modernization
6/2015-5/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Lathrop+Construction+-+Standard+Logo.jpg
Healdsburg High School Modernization
 

The Healdsburg High School Project consisted of the modernization of 4 existing building with all new utilities.  A new building pad with utilities and extensive exterior new landscape features.  Our portion of the work included the following:

  • Exterior site demolition and clearing.

  • All earthwork on the project including grading for building pad, exterior flatwork, asphalt and artificial turf areas.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Storm drain system

  • Sewer system

  • Fire main and domestic water services.

Project Characteristics

Public Work

Contract Amount:  $1,020,000

Owner: Healdsburg Unified School District

General Contractor: Lathrop Construction Associates, Inc.

Big John's Market
10/2014-4/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
eddinger-new-web500.png
Big John's Market
 

The Big John's project consisted of demolition two buildings to make room for an expanded parking area and expansion of the Big John's Market.  Our portion of the work was the following:

  • Exterior site demolition and clearing.

  • Building Demolition.

  • All earthwork on the project including grading for building pad, exterior flatwork, parking lot & driveway.

  • Cement treat building pad.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Storm drain system

  • Sewer system

  • Fire main and domestic water services.

  • Electrical trenching & backfill.

Project Characteristics

Private Work

Contract Amount:  $1,300,000

Owner: John Lloyd

General Contractor: Eddinger Enterprises

Benovia Winery
6/2014-4/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
logo_benovia_centered_download.jpg
Ledcor-Logo.jpg
Benovia Winery
 

The Benovia Winery project consisted of demolition of one building to make room for a new winery production facility. Our portion of the work was the following:

  • Building Demolition.

  • All earthwork on the project including grading for building pad, exterior flatwork, parking lot & driveway.

  • Aggregate base installation under all exterior flatwork and asphalt.

  • Site asphalt paving.

  • Storm drain system

  • Sewer system, Advantex system.

  • Fire main and domestic water services.

  • Fire storage tank.

  • Erosion Control

Project Characteristics

Private Work

Contract Amount:  $760,000

Owner: Benovia Winery

General Contractor: Ledcor Group

Completion: April 2016

Smart Train
2/2015-2/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
0.jpg
Smart Train
 

The Smart Train project was to create a new maintenance facility in Santa Rosa for the trains, work at various railroad crossing and future Smart Train stations.  Our portion of the work was the following:

  • Grading for railroad tracks Santa Rosa maintenance station.

  • Drainage system and ballast installation under railroad tracks at the Santa Rosa maintenance station.

  • Electrical & Gas trenching and backfill Santa Rosa maintenance station.

  • Paving at various railroad crossings and tunnel fire access road San Rafael.

  • Build construction access roads various stations Sonoma County.

Project Characteristics

Public Work

Contract Amount:  $800,000

Owner: SMART

General Contractor: Shimmick Construction

Lake County Emergency Fire Cleanup
11/2015-1/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
pacificstatesLogo_original-e146436993874
Lake County Emergency Fire Cleanup
 

The Lake County emergency fire cleanup project consisted of the cleanup of burnt residences after the devastating 2015 fire in Middletown and on Cobb Mountain. Engelke Construction had up to 3 five man crews on the cleanup.  Each crew consisted of two operators, three laborers an excavator and skidsteer.

Project Characteristics

Public Work

Contract Amount:  $850,000

Owner: N/A

General Contractor: Pacific States

Healdsburg Avenue Bridge Retrofit
12/2015-2/2016
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
Document.png
Healdsburg Avenue
Bridge Retrofit
 

The Healdsburg Avenue Bridge project was to retrofit the existing bridge and install a new water main.  Our portion of the work was the following:

  • Install new water main on both sides of the bridge.

  • Testing of the main installed by us and the main on the bridge.

  • Tie in new system to existing water system.

Project Characteristics

Public Work

Contract Amount:  $133,000

Owner: City of Healdsburg

General Contractor: Granite Construction

Our Older Projects

Laney Thorton Dam House Site
2006
Lamar & Norma Hunt Reservoir
2005
Geysers Recharge
2003

All projects below by Engelke Brothers Construction

Boschetto Residence
1999-2000
Carson Warner Memorial Skatepark
1999
Joe Montana Ranch
1998
Magnolia Subdivision
1996
Russian River Rip Rap
1995
Caltrans Hwy 36 Red Bluff
1992
Syar Healdsburg
1990
Drew Commercial Building
1990
Santa Rosa Jr. College
1989
418 B Street Santa Rosa
1989
Swenson Building (future Bear Republic Brewing Co. home)
1987-1988
National Guard Armory Benecia
1988
Hudson Street Healdsburg
1988
Redwood Lumber Company Windsor
1987
Big O Tires Healdsburg
1987
Healdsburg Public Library
1985-1986
Laurel Springs Subdivision
1985